Verrazano Narrows Bridge
Reconstruction and Rehabilitation of the Upper Level Approach Decks at the Verrazzano Narrows Bridge
Project Description
VN-17A – Upper Level Approaches:
The Project consists of the removal and replacement of the Staten Island and Brooklyn upper level approach decks and expansion joints; repair and strengthening of the upper level approaches superstructure; and installation of open road tolling gantries, equipment, and associated on-grade full depth concrete roadway reconstruction.
T
Scope of Work
Key Elements:
Concrete deck demolition and replacement using cast-in-place concrete
Cast-in-place concrete parapet and median barrier
Structural lifting under dead and live load conditions
Replacement of approach span bearings with isolation bearings
Removal and replacement of the upper level anchorage deck superstructure (steel bents, bearings, stringers, diaphragms, decks and joints)
Structural lifting and bearing replacement
Replacement of concrete pier columns
Replacement of concrete viaduct expansion bents
Concrete substructure repairs
Bridge drainage improvements
Sign structure removal and replacement
Replacement of bridge electrical and lighting systems
Lead and asbestos abatement
Multiple stage work zone traffic control
New Open Road Cashless Tolling gantries and systems
Project Information
Location Brooklyn & Staten Island, NY
Contract type Design-Bid-Build
Owner MTA Bridges & Tunnels (TBTA)
Designer Weidlinger Associates
Value $144M
Status On-going, Estimated completion August 2022

Let’s Build Together
Have questions about El Sol? Over our 40 years of service we value communication as the key to help us deliver projects efficiently, on time and on budget. Communication that builds relationships that lasts a lifetime. We encourage you to get in touch with us with any questions or thoughts you might have for us.